Sprinkler Uniformity Test Calculator

Your sprinkler can run the right number of minutes and still leave dry stripes — if some spots get twice the water others do, the average hides the problem. Run the tuna-can test, type in what each can caught, and this calculator scores your distribution uniformity, flags the over- and under-watered spots, and tells you how to fix each one.

Your catch-can measurements

Use at least 6–8 cans for a trustworthy score; more cans across the zone is better.

Measure each can with a ruler to the nearest 1/16 inch (0.06). Cans below 70% of the average turn red; cans above 130% turn amber.

Your uniformity score

Enter the depth in every can and the score builds itself.

How to run the tuna-can test

  1. Grab straight-sided cans (tuna cans, cat-food cans, or coffee mugs) — one for each spot on the grid. Use cans of the same size so the depths compare fairly.
  2. Scatter them across one sprinkler zone — some near the head, some halfway out, some at the far edge, and a couple in the corners where coverage usually fails.
  3. Run that zone for 15 minutes, then turn it off. Don't run it on a windy day — wind skews the test.
  4. Measure the depth in each can with a ruler, in inches, and type each number into the grid above. That's it — the score updates live.

Test one zone at a time. A zone can score great while the next one over is a mess, especially if the two zones use different head types or pressures.

How the math works

Distribution uniformity (DU) is the irrigation industry's standard score: sort all your can depths, take the average of the driest quarter, and divide it by the average of all the cans. DU = (average of lowest quarter) ÷ (overall average). A DU above 0.75 is excellent, 0.55–0.75 is good, and below 0.55 needs work — the driest quarter of your lawn is getting less than half the water the average spot gets. Coefficient of uniformity (CU), the Christiansen formula, is a second opinion: 1 minus the average absolute deviation from the mean, divided by the mean. CU above 80% is good; below 70% is poor.

The runtime math follows from the average rate: average depth ÷ test minutes × 60 gives inches per hour, and target inches ÷ rate gives the runtime. The "runtime so the driest spots get enough" number divides that runtime by your DU — because the dry quarter only receives DU × the average, it needs 1 ÷ DU times longer to reach the target.

A quick sanity check: if your average depth is under 0.1 inch in 15 minutes, your output rate is under 0.4 in/hr — very slow heads. Over 0.75 inch in 15 minutes (3 in/hr) is unusually fast for a lawn sprinkler; double-check the measurements.

Keep reading

More free tools: Sprinkler Runtime Calculator · Sprinkler Head Layout Planner